A Guide on How to Estimate Cost of Construction Projects

This skill is not easily acquired. Estimation of cost of construction projects is a very complex procedure containing many variable factors. Proper study, training and experience are needed to become proficient in construction project cost estimating.

There are several categories that can have significant impacts on undertaking costs. The estimator must be aware of them and properly evaluate their effects, prior to finalizing the cost estimate.

The best references for cost estimation are similar projects. Final cost items and related expenses of similar projects helps in estimation which are invaluable.

Costs for substances and supplies, plus shipping charges are required prior to starting estimation process.

Local labour rates or as specified by local government is taken for calculation of labour costs for project.

undertaking site conditions that can increase building costs are: poor soil conditions, wetlands, contaminated materials, conflicting utilities (buried pipe, cables, overhead lines, etc.), environmentally sensitivity area, ground water, river or stream crossings, heavy traffic, buried storage tanks, archaeological sites, endangered species habitat and similar existing conditions.

When utilizing previous, similar projects as a primary basis for estimating, consider the Construction Cost Index as published in the Engineering News Record. The presence of inflation is always a factor that can be extremely variable. This nationwide tabulation of the construction industry has been continuously recorded for decades.

The timing of the bid opening can have a substantial impact on obtaining a low bid. Seasonal variations in construction activity and conflicts with other bid openings are critical factors.

The building schedule can certainly affect the cost. If the project needs too aggressive of a time frame, generally the price increases, especially if there is a substantial liquidated damages condition for failure to complete within a specified deadline.

Conversely, if the award notice is beyond a reasonable time and the notice to proceed is indefinite, the contractor’s fear inflation of substance costs and may have other undertakings that have priority. Any time beyond 60 days may result in higher bids. Therefore, most bidders will inflate their bids to protect against these conditions.

It is extremely important that every detail and component of the design be properly executed and fully described. There is no substitute for well-prepared plans and specifications. Any vague wording or poorly drawn plan not only causes confusion, but places doubt in the contractor’s mind which generally results in a higher bid.

If the undertaking engineer or engineering firm has a good sound professional reputation with contractors, it is reflected in reasonably priced bids. If a contractor is comfortable working with a particular engineer, or engineering firm, the undertaking runs smoother and therefore is more cost-effective.

Some granting agencies have considerable additional paperwork that is not normally needed in a non-funded project. Sometimes this expected extra paperwork elevates the bid. If a granting agency is involved in funding a portion of the project, contractors will take this into consideration when preparing their bids.

Sometimes there are conditions in regulatory agency approvals that will be costly to perform. Therefore, to be completely above-board with potential bidders, it is strongly recommended that copies of all regulatory approvals be contained in all bidding documents.

General insurance requirements, such as performance bond, payment bond and contractor’s general liability are normal costs of doing business. on the other hand, there are special undertakings that require additional coverage. Insurance premiums for these supplemental policies add to the undertaking cost and must be considered up front. Railroad crossings are a prime example.

The size and complexity of a project determines if local contractors have the capacity to execute the work. This is good for competition, but may increase mobilization costs. The larger and more intricate the proposed project is, the more it will potentially attract the attention of a broader number of prospective bidders.

The location of the proposed work can be a substantial component in developing a realistic cost estimate . A rural setting usually has a limited labour force skilled in the construction trades.

Therefore, the contractor must import tradesmen and generally pay per diem expenses; i.e., out-of-town lodging and related costs. Additionally, remote settings increase the charges for material shipment.

Some agencies mandate that multi-million dollar projects perform a value engineering review, prior to finalizing the design or commencing the bidding process . Therefore, the estimator should be aware of this factor early in the process.

The rule-of-thumb has historically added a 10% contingency on the construction total to cover those unforeseen costs that crop up as a undertaking evolves. During times of high inflation or the limited amount of key construction substances and supplies, it is wise to increase the contingency to 15% or 20% for a more realistic estimate and provide a safety factor.

As stated in Item 4, some undertaking sites will require special studies and/or investigations. Costs for this special work should be included in the initial cost estimate to avoid future surprises.

In the final analysis, the best component of a good cost estimate is the art of practicing sound technical judgement. This factor is acquired by experience and the mentoring of senior personnel.